A Soil consolidation project
In this project about 700.000 meters of wickdrains (prefabricated vertical drains-PVD) were specified. Working with sand drains need more time and work. The soil should be consolidated quickly, and the road is near the sea. It was like draining the sea. At the top of the soft soil a sand layer was placed to move the machines and also for drainage. The contractor preferred a ...





