wickdrain - Geosynthetics World
Article Category

wickdrain

Июл 5, 2008

A Soil consolidation project

In this project about 700.000 meters of wickdrains (prefabricated vertical drains-PVD) were specified. Working with sand drains need more time and work. The soil should be consolidated quickly, and the road is near the…

Июл 4, 2008

A Soil consolidation project

In this project about 700.000 meters of wickdrains (prefabricated vertical drains-PVD) were specified. Working with sand drains need more time and work. The soil should be consolidated quickly, and the road is near the…

Июл 3, 2008

A Soil consolidation project

In this project about 700.000 meters of wickdrains (prefabricated vertical drains-PVD) were specified. Working with sand drains need more time and work. The soil should be consolidated quickly, and the road is near the…

Июл 2, 2008

A Soil consolidation project

In this project about 700.000 meters of wickdrains (prefabricated vertical drains-PVD) were specified. Working with sand drains need more time and work. The soil should be consolidated quickly, and the road is near the…

Июл 1, 2008

A Soil consolidation project

In this project about 700.000 meters of wickdrains (prefabricated vertical drains-PVD) were specified. Working with sand drains need more time and work. The soil should be consolidated quickly, and the road is near the…

Окт 14, 2007

Why use PVD over sand drain

PVD’s have high discharge capacities, typically 30 x 10-6 m3/sec to 90 x 10-6 m3/sec compared to a Ø 0.35 sand drain with a discharge capacity of 20 x 10-6 m3/sec (Van Santvoort, 1994).…

Авг 6, 2007

Calculation of PVD’s 3 — Kjellman formula

where: t = consolidation period (years) D = diameter of drained soil cylinder (m) d = equivalent diameter of drain (m) Ch = horizontal consolidation coefficient (m2/year) Uh = average horizontal consolidation degree

Авг 5, 2007

Calculation of PVD’s 2 — Equivalent PVD diameter

calculation assumes PVD cylindrical and draining effect dependent on periphery PVD effective periphery is 2 x width x f, where f is a correction factor allowing for: less favorable inflow to possible disturbance &…