Anchorage of wickdrains

During the installation of prefabricated wick drains (Prefabricated vertical drains) for soil consolidation you need some materials under the mandrel (lance) to hold the drain in the soil when you pull the mandril back.…

Окт 1, 2010

Standards for prefabricated vertical drains (wickdrains)

ISO 12958:1999    Geotextiles and geotextile-related products — Determination of water flow capacity in their plane ISO 10319:1993   Geotextiles — Wide-width tensile test ISO 11058:1999   Geotextiles and geotextile-related products — Determination of water permeability characteristics…

Июл 27, 2010

Why use PVD over sand drain

Why use PVD (Prefabricated vertical drain) over sand drain Installation of PVDs typically 6,000 linear meters per day (depending on the soil and the machine used it changes from 2000 to 8000) and result…

Дек 21, 2009

Principle installation of PVD

Principle installation of Prefabricated Vertical drains Specialized rig Mandrill supported inside a leader held by crane or hydraulic excavator Mandrill pushed into soil by chains/cables driven by hydraulic engines. PVD installed inside a mandrill…

Июн 15, 2009

What is a PVD ?

Prefabricated Vertical Drain — PVD Also called as wickdrain. Used for soil consolidation, settlement instead of sand drains. Typically 95 -100 mm wide by 3 — 5 mm thick Synthetic core wrapped with geotextile…

Июл 28, 2008

A Soil consolidation project

In this project about 700.000 meters of wickdrains (prefabricated vertical drains-PVD) were specified. Working with sand drains need more time and work. The soil should be consolidated quickly, and the road is near the…

Июл 27, 2008

A Soil consolidation project

In this project about 700.000 meters of wickdrains (prefabricated vertical drains-PVD) were specified. Working with sand drains need more time and work. The soil should be consolidated quickly, and the road is near the…

Июл 26, 2008

A Soil consolidation project